{"id":17562,"date":"2015-01-16T01:24:18","date_gmt":"2015-01-16T06:24:18","guid":{"rendered":"http:\/\/newenglandracingnews.com\/blog\/?p=17562"},"modified":"2015-01-16T23:24:39","modified_gmt":"2015-01-17T04:24:39","slug":"daytona-international-speedway-names-schneider-electric-latest-built-daytona-partner","status":"publish","type":"post","link":"https:\/\/newenglandracingnews.com\/blog\/2015\/01\/daytona-international-speedway-names-schneider-electric-latest-built-daytona-partner\/","title":{"rendered":"Daytona International Speedway Names Schneider Electric As Latest \u201cWe Built Daytona\u201d Partner"},"content":{"rendered":"<p><a href=\"http:\/\/newenglandracingnews.com\/blog\/wp-content\/uploads\/2015\/01\/strtgdy.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-17563\" src=\"http:\/\/newenglandracingnews.com\/blog\/wp-content\/uploads\/2015\/01\/strtgdy.jpg\" alt=\"strtgdy\" width=\"240\" height=\"180\" \/><\/a>DAYTONA BEACH, Fla. \u2013 Daytona International Speedway (DIS) today announced that Schneider Electric,<br \/>\na global specialist in energy management, has become the latest partner in the \u201cWe Built Daytona\u201d marketing platform for the $400 million DAYTONA Rising redevelopment project.<\/p>\n<p>Schneider Electric will provide a single view into all critical infrastructure systems through its EcoStruxure solution, allowing for a reliable and energy efficient fan experience. Additionally, Schneider Electric will coordinate with its other partners to provide an integrated solution including power distribution, electrical metering, building management controls and further integration of elevators, escalators, lighting, fire systems and generators.<\/p>\n<p><!--more--><\/p>\n<p>\u201cSchneider Electric is pleased to have been chosen to provide important infrastructure, energy and integration solutions for the new Daytona International Speedway,\u201d said Jim Sandelin, Senior Vice President, Schneider Electric. \u201cAs we do with thousands of other top-tier organizations around the globe, our focus will be to help the DAYTONA Rising project be successful for the surrounding community, race teams, fans and everyone associated with DIS. We\u2019re pleased to partner with such a prestigious organization and look forward to using the new DIS as another example of the value Schneider Electric brings to customers.\u201d<\/p>\n<p>The \u201cWe Built Daytona\u201d platform is designed specifically for partners involved in the construction of DAYTONA Rising and enables them to showcase their involvement through a marketing presence (once their role in the project begins). Financial terms of the agreement were not disclosed.<\/p>\n<p>\u201cWe\u2019re thrilled to welcome Schneider Electric to our \u2018We Built Daytona\u2019 family of partners,\u201d said Daytona International Speedway President Joie Chitwood III. \u201cTheir leading solutions are an ideal fit for our needs and will help to power the massive DAYTONA Rising project.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>DAYTONA BEACH, Fla. \u2013 Daytona International Speedway (DIS) today announced that Schneider Electric, a global specialist in energy management, has become the latest partner in the \u201cWe Built Daytona\u201d marketing platform for the $400 million DAYTONA Rising redevelopment project. Schneider Electric will provide a single view into all critical infrastructure systems through its EcoStruxure solution, [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[15675],"class_list":["post-17562","post","type-post","status-publish","format-standard","hentry","category-uncategorized","tag-daytona-international-speedway"],"_links":{"self":[{"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/posts\/17562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/comments?post=17562"}],"version-history":[{"count":1,"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/posts\/17562\/revisions"}],"predecessor-version":[{"id":17564,"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/posts\/17562\/revisions\/17564"}],"wp:attachment":[{"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/media?parent=17562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/categories?post=17562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newenglandracingnews.com\/blog\/wp-json\/wp\/v2\/tags?post=17562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}